Issues Medit
Mise au point d'une méthode de fixation mécanique des dunes mobiles dans une zone présaharienne du sud tunisien
Medit, vol 8, n.1, (March 1997), pp. 14-19
Language: FRThis experimental study carried out in East Southern Tunisia showed that efficient and not very costly drifting sand fixation are possible thanks to various mechanical stabilization technics. Two «squaring systems" were compared with two parallel rows systems and the better results were provided by 20 m side squares and the 20 m interval parallel rows. Although the latter technics is, nearly, as efficient as the first one, however, its cost is proved twice lower. This work permitted, in addition, defining specific stages of use for a better optimisation and organisation of drifting sand fixation works.
L'expérimentation, objet du présent travail mené à Sidi Makhlouf dans le sud-est tunisien a permis de montrer qùil est possible de fixer d 'une manière efficace et à moindre coût les dunes de sable mobile grâce à différentes techniques de stabilisation mécanique. Deux systèmes de carroyage de 20 m et de 40 m ont été comparés à deux systèmes de lignes parallèles espacées de 20 et de 40 m. Les meilleurs résultats ont été fournis par les carreaux de 20 m de côté et les lignes espacées de 20 m. Cependant, ces derniers touts en étant aussi efficaces techniquement que les carreaux de 20 m se sont avérés deux fois moins coûteuses. Ce travail a en outre permis d'identifier différentes étapes spécifiques d'intervention permettant une meilleure optimisation et organisation des opérations de fixation des sables mobiles.
Download the article